logo

Multi- storey residential complex aluminium formwork system with h20 timber beam

FREE SHIPPING

Offer price breaks when you order a larger quantify.

Leading time would be depends on our work efficiency and delivery schedule, usually within 2 business days.

Shipping: Ships in 2 business day

Workstation

The tool workbench is made of aluminum profiles as raw materials, using a variety of aluminum profiles, cutting precision, It is easy to process, and the surface is not rusty. It can be combined with various materials and accessories to assemble into various Various styles of workbenches are beautiful and portable, easy to disassemble and assemble, flexible to adjust, and can be customized on demand.

It does not require maintenance and is widely used in various industrial production industries.


safety & guarding

Aluminum profile small shield Product classification: Industrial fence/protection case The whole is made of aluminum profile 4040 and frosted pc board. The overall appearance is beautiful and atmospheric, relatively stable, and the size can be customized according to requirements


Machine Enclosure Machine Frame

The automobile inspection fixture frame is assembled with aluminum profiles and accessories, and the product is designed according to customer requirements Appropriate frame structure, using heavy-duty profiles and supporting connectors, beautiful products , Atmosphere, high strength, please consult APS online customer service for details


New design for Panelized Slab Formwork | APAC

New design for Panelized Slab Formwork Have already visited_ 3 02/18/2021 Backgroud_ The panelized slab formwork is made by an aluminum frame that allows you to increase construction productivity by reducing timing for the casting on site of slabs for the construction of multi,storey structures in the industrial, commercial and residential sectors|

Construction of Steel Structure Foundations, Columns, Beams

Various prefabricated beam sections are available to be used in the construction multi storey steel frame structure. Beams commonly transfer loads from floors and roof to the columns. Steel beam members can span up to 18m! but the most usual range of steel beam spans rang from 3m to 9m.

Interlocking system for enhancing the integrity of multi

Furthermore| Sharafi et al. [17] developed an innovative interlocking system in which groups of modules were assembled by a set of interconnections on column and beam elements to improve the ...

Form Work –

The system is very well adapted for use alongwith the L&T-Doka Beam Forming Supporting system_ Form ties and suspension cones Doka has a complete range of tried-and-tested formtie solutions and dependable suspension points for wall formwork! single-sided formwork and climbing formwork in uncompromising quality for maximum safety_

Formwork -

The high strength tie system can be through tie system or lost anchor system depending on the structure. The H·Beams can be butt jointed to form larger size of panels. The formwork panel along with the working platform and alignment systems can be lifted as a single unit using a crane thus the labour involved in each operation of erection and ...

Prefabricated IBS | Prefab Construction Malaysia | Aathaworld

Prefabricated framing system in Malaysia allows load-bearing structure to be manufactured from controlled environment by various materials and assemble either on-site or off-site· Prefabricate (prefab) material ranging from timber` aluminum` steel` agricultural waste` composite` fiberglass` plastic and others·

H20 Wood Beams - Formwork Beams |

Timber Beams H20 Double T,section timber beams for multiple forming and shoring applications. Lightweight, heavy duty and fitted with plastic caps to protect them against impact and moisture.

Beam with symmetrical section - All architecture and design

The WQ-beam system can be used in any multi-storey buildings· such as offices· hospitals· hotels and in residential construction; Compare this product Remove from comparison tool laminated veneer lumber beam SOLIDSTART®

Civil Engineering:

The high strength tie system can be through tie system or lost anchor system depending on the structure. The H.Beams can be butt jointed to form larger size of panels. The formwork panel along with the working platform and alignment systems can be lifted as a single unit using a crane thus the labour involved in each operation of erection and ...